Skip to content

Care plans and maintenance in detail: series, single tasks, skipping, and moving

Everything about recurring care: which kinds and rhythms exist, how to create, change, and end a series, how to skip or move a single task only, and what every button does.

Tutorial 8 min read
On this page

A care plan is a series: a task that recurs on a fixed rhythm, such as “clean filter every 14 days” or “fertilizer on Mondays and Thursdays”. Each plan creates single tasks in the tank's calendar. This page explains both levels: how to create, change, and end a series, and how to handle a single task without touching the series.

Where to find care plans

On the tank in the Care area. The plans are at the top; the single tasks live in the calendars: the tank's day calendar, the feeding view, and QuickFeed. Creating a plan starts a new series. Next to the heading you see how many active plans the tank has and how many the plan allows.

Plan active care plans per tank
Personal 8
Hobby 30
Pro 100
Expert 250
Business and Enterprise 500

Kinds of care

Kind Used for Extra fields
Measurement measure a water value regularly parameter (required)
Feeding a feeding task that does not come from a feeding plan label
Dosing fertilizer, conditioner, bacteria what is dosed, how much
Maintenance filter, glass, hoses, equipment label
Water change regular partial water change liters or percent of the tank

Dosing starts with Hobby. For a measurement there is at most one active plan per parameter; a second plan for the same value is rejected. For a water change you choose liters or percent. Percent needs the tank's volume.

Rhythms

The rhythm says when a task is created. Which rhythms you can choose depends on the plan:

Rhythm Meaning From
Daily every day at the chosen time Personal
Every X days for example every 3 days, 1 to 365 Personal
Specific weekdays for example Monday and Thursday, at least one day Personal
Once a single task on the anchor date Personal
Every X weeks for example every 2 weeks Hobby
Day of month day 1 to 28 of each month Hobby
Last day of month always on the last day Hobby
X days after completion the next task comes X days after the last completion Hobby
After an event a task is created when a water change is logged Pro
After a deviation a task is created in response to a reading Pro

The day of month only goes up to 28 so that every month has the task. For the end of the month use last day of month.

The other fields

  • Label: how the task is named in the calendar, for example “Clean external filter”.
  • Time and time zone: the time applies in the tank's time zone.
  • Anchor date: from when the series counts. For every X days or weeks it decides which days the tasks fall on. For once it is the task's date.
  • Priority: low, normal, or high. It decides the order and how prominently a task is shown.
  • Calendar-fixed or after completion: calendar-fixed stays on the weekday even if you complete late once. After completion moves with the actual date.

Create a series

  1. Open plan creation

    On the tank, under Care, create a plan.

  2. Choose the kind

    For example Maintenance. Depending on the kind, the matching fields appear: what and how much for dosing, liters or percent for a water change, the parameter for a measurement.

  3. Set label and rhythm

    A clear label and the rhythm, such as every X days with 14. For fixed weekdays choose specific weekdays and tick the days.

  4. Time, anchor date, and priority

    The time the task becomes due, the date from which the series counts, and the priority.

  5. Decide what happens on a missed day

    Under what happens when the day passes, choose the reaction, for example shift to the next day for maintenance that should be caught up. All options are explained in Critical values and missed tasks.

  6. Save

    After saving, the tank confirms the plan was created. The tasks appear in the calendars immediately.

Change a series

Editing the plan changes everything: kind, rhythm, time, priority. On saving, Aquarisma replaces the open task with a new one following the new rules. Tasks already completed or skipped stay as they are and remain in the history.

End a series

Retire ends a plan. Aquarisma cancels all open tasks of this series and confirms that the plan is retired and open tasks are cancelled. The plan then appears marked as retired in the list of retired plans. Completed tasks and the history stay complete.

Handle only a single task

On the task in the calendar you have these options. None of them changes the series.

Complete

Done logs the task. Depending on the kind, the button reads differently: Dosed for dosing, Log water change for a water change. Before that, Aquarisma shows what will be recorded, for example that the water change with 30 % will be logged directly. A note is optional, for example “filter very dirty”.

Skip

Not done? or Not today? opens skipping. You choose a reason:

  • Not needed
  • Already done another way
  • Other reason, with free text

The task then counts as skipped. The series continues; the next task comes as planned. For water changes and dosing QuickFeed asks explicitly, because a skipped change can worsen values.

Skip a whole day

If a day has several tasks from the same series, skip the whole day of that series in one step, also with an optional reason.

Move

Postpone moves the task to another day or time. Under where to, pick day and time. The task then says it was moved to the new time, and the new day says where it was moved from. Undoing the move brings it back to its original place. If something is already done at the new time, Aquarisma says so.

Adjust ahead

A future task cannot be completed yet. Through adjust ahead you can already skip or move it, for example when you know you will be away at the weekend.

Undo

Completed or skipped by mistake? Open the task and choose undo. The task is open again. If the completion is tied to a reading or a water change, correct it in the tank's history.

Extra work without a plan

Not every maintenance needs a series. Via the calendar's log entry you record something for this day: maintenance, dosing, a water change, or a reading. If a matching task is already planned that day, it is marked done. Otherwise the entry stands on its own in the calendar.

You can also log a water change directly with liters or percent and, if measured, the values of the fresh water. Plans with the rhythm after an event then open their tasks.

Clean up missed tasks

If overdue tasks have piled up, clean them up at once. They then count as skipped with the reason “missed, cleaned up” and no longer show as overdue. The plans continue normally.

Who can do what

Permission Allows
tanks.care.create create care plans
tanks.care.update change care plans
tanks.care.delete end (retire) care plans

Completing, skipping, and moving tasks belong to the tank's care permissions. A tablet seat and a guest link with write access can complete and skip tasks but cannot create plans.

How do I delete just one task from a series?

Skip it on the task (skip with a reason) or move it. The series stays unchanged.

How do I delete the whole series?

Retire the plan. Open tasks are cancelled, completed ones stay in the history.

I changed the rhythm, but an old task is still in the calendar.

Only the open task is replaced. Clean up moved or overdue tasks with clean up or skip.

Why can't I choose day of month?

That rhythm starts with Hobby. Personal has daily, every X days, specific weekdays, and once.

Can I mark tomorrow's task as done already?

No. Future tasks can only be skipped or moved ahead. A task is completed on its day.

Sign in and open the feature in the panel

Sign in to open the panel
Was this article useful?

Reaction

Review status of this version

Route check: 28 November 2026. Checked against the routes, permissions, and tariff source of this version. A page that still opens is not automatically current.