Skip to content

Complete or skip care

Done through care.log, skip day through care.day.skip – with undo in history.

Done, skip, day vs. date. Tutorial 3 min read
On this page

Open care tasks sit on the tank calendar and under feeding · Today when the plan mirrors them there. Done logs the work through panel.tanks.care.log. Skip leaves the date visible as skipped. Skipping a whole day is panel.tanks.care.day.skip – not the same as one date.

  1. Open the date

    Planned and Due now are two states.

    On the tank calendar or under feeding · Today you find open care. Tap opens the dialog with Done and Skip.

    An immediate step in a chain asks for a short note of what you did.

    Open the date
    1. 1Done
    Tanks
  2. Done

    Save posts to panel.tanks.care.log.

    The action is Done, Dosed for dosing, Record water change for water changes. Save stores the task as finished.

    That is a log of your work, not a new reading, unless the type is explicitly measurement.

    Done
    1. 1Done
    Tanks
  3. Skip

    Skip does not rewrite the date as done.

    Skip allows an optional reason. The date stays visible as skipped and is not rewritten as finished work.

    Single dates and the whole day use different forms.

    Skip
    1. 1Skip
    Tanks
  4. Whole day vs. one date

    panel.tanks.care.day.skip is the day action.

    Skip a whole day posts to panel.tanks.care.day.skip. That affects every open care task on that day for the tank.

    Skipping one date stays on the individual task. Both remain visible in history, but not as finished work.

    Whole day vs. one date
    1. 1Skip
    Tanks
  5. Done and undo

    History stays traceable.

    After Done you see the message for the completed task. Finished care stays visible in history.

    If you undo it, the task is open again. The entry stays struck through – that is the undo note in the log, not deletion from history.

    Done and undo
    • Done uses panel.tanks.care.log.
    • Skip day uses panel.tanks.care.day.skip.
    • Skipped stays skipped, not done.
    Tanks
Does Done replace a reading?

Only when the plan type is measurement and you save the reading session separately. Water changes and maintenance are their own care events.

What happens when I undo?

The task is open again. The old entry stays struck through in history.

Sign in and open the feature in the panel

Sign in to open the panel
Was this article useful?

Reaction

Review status of this version
  • ✓ Interface checked on live routes — 2026-10-29
  • ✓ DE/EN screenshots with marks — DE/EN, Markierungen
  • ✓ Core panel flow exercised
  • ✓ English UI version checked
  • ✓ Facts checked against code and tariff source — Tarif/Code

Route check: 25 October 2026. Checked against the routes, permissions, and tariff source of this version. A page that still opens is not automatically current.